POWWOD finds commercial rooftops, cold-storage facilities and large parking lots with real solar and storage potential, screens them for economics, permitting and grid risk, and matches qualified opportunities with the developers who build them.
What we do
Most site lists stop at an address. POWWOD does the early development work that decides whether a site is worth a developer's time: usable-area and capacity screening, load and rate context, permit-path research, and a first grid screen — before any introduction is made.
We identify commercial and industrial properties across Southern California — cold storage, food processing, warehouses, manufacturing and large parking assets — using public records, parcel data and operator information.
Every candidate site is screened on three tracks: energy economics, permitting path, and interconnection risk. Sites that fail early checks are recorded with the reason, not passed along.
Qualified sites are matched against each developer's own Buy Box — territory, project type, size range and site criteria — so developers see opportunities that fit how they actually buy.
Where we focus
Our coverage starts where the load is: refrigerated and industrial corridors in Los Angeles, Orange, Riverside and San Bernardino counties, across SCE and municipal utility territories.
Refrigerated warehouses run long hours with steady daytime load — among the strongest commercial solar profiles when the roof and structure qualify.
Large flat industrial and commercial roofs screened for usable area, roof age, structure and shading before a capacity figure is ever quoted.
Parking lots and garages where the roof is too small, too old or too complex — screened for layout, circulation, ADA and structural cost drivers.
Behind-the-meter storage for demand-charge management and solar shifting, screened for rate structure, load shape and fire-code path.
How it works
Every opportunity moves through the same evidence-based stages. A site is never presented as more than it is: a discovered site is not a qualified opportunity, and a qualified opportunity is not a project ready to build.
Candidate sites are identified from public data and recorded with their sources.
Economics, permitting and grid screens are run; gaps and risks are written into the site record.
No site advances without a person with authority at the property confirming interest. No exceptions.
Qualified sites are documented in an Opportunity Report and matched to developers whose Buy Box they fit.
The developer accepts or declines with reasons. Decline reasons are recorded and used to sharpen future screening.