Every developer has a story about the perfect roof that was not: the membrane was at end of life, the structure could not take ballast, the decision-maker was a lender, or the load left the building two tenants ago. Developer-ready is an evidence standard, not a size threshold. These are the items POWWOD assembles before a rooftop is presented as a qualified opportunity.
1. A roof with years to give
The array will sit for two decades or more, so the roof must outlast the financing. Evidence: installation or re-roofing date from permits or owner records, membrane type, warranty status where available, and any planned roof work. Unknown roof age is the most common single gap in early site records — and the first question a developer asks.
2. Structure that can be engineered, not guessed
Screening records building construction type, era and span, and flags anything unusual for the structural engineer who will ultimately decide. Screening never certifies capacity; it makes sure the engineer receives a site worth the fee.
3. Usable area, honestly measured
Setbacks, fire access, skylights, drains, HVAC and shading come out of the gross footprint before capacity is discussed. A smaller honest number beats a larger one that collapses at design.
4. Load that stays
Daytime load from a stable operation is the economic engine. Screening looks at what the tenant or owner does, how long they have done it there, and whether the operation's hours match solar production. A warehouse that emptied last year is a land story, not a rooftop story.
5. A decision-maker who has said yes to talking
Ownership structure, property management, and who controls energy decisions are researched from public records. Then the only step that cannot be shortcut: that party confirms interest. No confirmation, no opportunity — the site remains a screening record.
6. A grid and permit path with no early red flags
Utility territory established, hosting-capacity picture checked, city permit path identified from official sources. Red flags do not always kill a site — but they must be in the record, priced into everyone's expectations, before introductions are made.
When those six items are documented with sources, a rooftop is developer-ready for review: not approved, not financed, not built — ready for a developer's own diligence to begin. That precision is the service. Read the full standard on our Site Qualification page.